Tomorrow (Tuesday February 9, 2016) the intersection at Pt. San Pedro Road, Lochinvar and Loch Lomond Drive will be a 4-way stop from approximately 8:00 am to 5:00 pm while work is done on the signal system changeover to install new equipment.
Tomorrow (Tuesday February 9, 2016) the intersection at Pt. San Pedro Road, Lochinvar and Loch Lomond Drive will be a 4-way stop from approximately 8:00 am to 5:00 pm while work is done on the signal system changeover to install new equipment.