Since many of our residents commute or otherwise travel over the Golden Gate bridge, this information is very important.
- During the weekend of January 10-12, The Bridge District will be installing a moveable median barrier system to replace the plastic pylons. The bridge will be closed starting at 12:01am on Saturday, January 10 and will reopen at 4:00 am on Monday, January 12 for all vehicular traffic except Golden Gate Transit buses.
- Critically important, the new merge will be very different for southbound vehicles. Where drivers are currently used to merging from left to right, the new merge will be from right to left.
For more details and a video, see the post on this topic on the Pt. San Pedro Road Coalition website.